2. Four Steps to Reduced Consumption
Right sizing the ICT load


30% reductions before you get to the UPS

  1. Mandate use of Low-Power Processor in procurement policy → 10% savings
  2. Utilize High-Efficiency Power Supplies based on actual load vs 100% load  11% savings
  3. Switch on Server power management feature  8% savings
  4. Migrate to Blade and Virtualized server setup  9% savings


Back   Next