Data Center Environment Assessment
|
|
Thermal Assessment
- Air, Temperature and Humidity measurements
- Determine data center’s performance in doing equipment heat removal
- Identify hot spots
- Determine causes of hot spots and recommend how to reduce or eliminate them
- CFD – computational fluid dynamics
|
 |
| |
|
|
Electrical Assessment
- Determine capacity and integrity of electrical system supplying the data center
- Perform single point of failure analysis
- One line drawing verification and update
- Make recommendation to maximize system availability
|
 |
|
|
|
|
Floor Plan and Equipment List
- Log and update current floor plan
- Inventory record of facility power infrastructure equipment
- Inventory record of all air and rack equipment
|
|
|
|
|
|
Findings and Recommendation Report
- Detailed report that depicts true picture of data center
- Improvement recommendation report to eliminate “hot spots”, improve airflow and reduce heat in data center
- Improvement recommendation report to maximize system availability both now and in the future
|
|
|
|
|
|
|
|
|
|