Emerson St Louis Data Center
|

Know your design criteria!
New Tier III facility – Global Production Data Center
- Concurrently maintainable power and cooling infrastructure
- 99.982% uptime – average 1.6 hrs/yr unplanned downtime
State of the art technology and environmentally responsible
- Utilize Latest Emerson Network Power Products
- Integrated 100kW solar array on roof
- Targeting LEED Gold Certification
~35,000 ft2 building
- 12,000 ft2 of raised floor
- Ability to cool up to 300+ W/ft2
- Earthquakes, tornados, floods

|
|
|
|
|
|
|
|